Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
110
matching recommendationsNAICS | 32191 | Millwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0446 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,000 | $8,100 | Implemented |
OR0446 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,800 | $21,600 | Implemented |
OR0446 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,100 | $13,000 | Implemented |
OR0446 # 05 Y:2003 | 05 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $27,050 | $98,000 | Not Implemented |
OR0446 # 06 Y:2003 | 06 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,780 | $26,000 | Implemented |
OR0446 # 01 Y:2003 | 01 | 2003 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $508,000 | $28,000 | Not Implemented |
OR0444 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $967,810 | $181,200 | Implemented |
OR0444 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,210 | $8,170 | Implemented |
OR0444 # 02 Y:2003 | 02 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $30,800 | $2,000 | Not Implemented |
OR0444 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,600 | $18,610 | Not Implemented |
OR0443 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,080 | $10,100 | Implemented |
OR0443 # 06 Y:2003 | 06 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,770 | $665 | Implemented |
OR0443 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,348 | $0 | Not Implemented |
OR0443 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,950 | $16,800 | n/a |
OR0443 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,000 | $0 | Not Implemented |
OR0443 # 02 Y:2003 | 02 | 2003 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $46,744 | $15,000 | Not Implemented |
OR0443 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $563,900 | $520,900 | n/a |
AS0364 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,291 | $31,527 | Not Implemented |
AS0364 # 05 Y:2003 | 05 | 2003 | REDUCE VENTILATION AIR | $285 | $10 | Not Implemented |
AS0364 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $221 | $524 | Not Implemented |
AS0364 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,347 | $7,928 | Not Implemented |
AS0364 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $990 | $150 | Not Implemented |
UF0331 # 06 Y:2003 | 06 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,275 | $55,800 | Not Implemented |
UF0331 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $907 | $0 | Implemented |
UF0331 # 08 Y:2003 | 08 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $7,000 | $3,000 | Implemented |