IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 32191 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1609 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,223 $3,000 Implemented
UK1609 # 03 Y:2016 03 2016 INSULATE FEEDWATER TANK $380 $140 Not Implemented
UK1609 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $54,548 $0 Not Implemented
UK1609 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $657 $0 Implemented
BS0087 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $689 $5,040 Not Implemented
BS0087 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,907 $27,896 Not Implemented
BS0087 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $32,576 $43,711 Not Implemented
BS0087 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,873 $275 Not Implemented
BS0084 # 04 Y:2016 04 2016 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $751 $243 Not Implemented
BS0084 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,738 $825 Not Implemented
BS0084 # 02 Y:2016 02 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,854 $15 Not Implemented
BS0084 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,444 $31,350 Not Implemented
BS0084 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $118 $264 Not Implemented
BS0072 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $233 $48 Not Implemented
BS0072 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $56 $47 Not Implemented
BS0072 # 03 Y:2016 03 2016 PAY UTILITY BILLS ON TIME $217 $63 Not Implemented
BS0072 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,231 $15,400 Not Implemented
BS0072 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $240 $413 Not Implemented
BS0072 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $547 $582 Not Implemented
BS0072 # 07 Y:2016 07 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,023 $3,260 Not Implemented
BS0072 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $1,323 Not Implemented
UM0464 # 04 Y:2016 04 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $736 $150 Implemented
UM0464 # 05 Y:2016 05 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,107 $7,900 Implemented
UM0464 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,786 $3,794 Implemented
UM0464 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,842 $5,500 Not Implemented