Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsNAICS | 32191 | Millwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1609 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,223 | $3,000 | Implemented |
UK1609 # 03 Y:2016 | 03 | 2016 | INSULATE FEEDWATER TANK | $380 | $140 | Not Implemented |
UK1609 # 01 Y:2016 | 01 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $54,548 | $0 | Not Implemented |
UK1609 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $657 | $0 | Implemented |
BS0087 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $689 | $5,040 | Not Implemented |
BS0087 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,873 | $275 | Not Implemented |
BS0087 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,907 | $27,896 | Not Implemented |
BS0087 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $32,576 | $43,711 | Not Implemented |
BS0084 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $118 | $264 | Not Implemented |
BS0084 # 04 Y:2016 | 04 | 2016 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $751 | $243 | Not Implemented |
BS0084 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,738 | $825 | Not Implemented |
BS0084 # 02 Y:2016 | 02 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,854 | $15 | Not Implemented |
BS0084 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,444 | $31,350 | Not Implemented |
BS0072 # 01 Y:2016 | 01 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $233 | $48 | Not Implemented |
BS0072 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $284 | $1,323 | Not Implemented |
BS0072 # 07 Y:2016 | 07 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,023 | $3,260 | Not Implemented |
BS0072 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $547 | $582 | Not Implemented |
BS0072 # 05 Y:2016 | 05 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $240 | $413 | Not Implemented |
BS0072 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,231 | $15,400 | Not Implemented |
BS0072 # 03 Y:2016 | 03 | 2016 | PAY UTILITY BILLS ON TIME | $217 | $63 | Not Implemented |
BS0072 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $56 | $47 | Not Implemented |
UM0464 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,786 | $3,794 | Implemented |
UM0464 # 04 Y:2016 | 04 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $736 | $150 | Implemented |
UM0464 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,842 | $5,500 | Not Implemented |
UM0464 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $361 | $2,000 | Not Implemented |