IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

344

matching recommendations
Reset
NAICS 321911 Wood Window and Door Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0462 # 01 Y:2012 01 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $21,080 $25,000 Not Implemented
NC0462 # 02 Y:2012 02 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $107,890 $305,000 Not Implemented
NC0462 # 03 Y:2012 03 2012 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,910 $20,000 Not Implemented
NC0462 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,190 $400 Implemented
NC0462 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $102 $200 Implemented
NC0462 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,686 $11,000 Implemented
NC0462 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,392 $8,400 Implemented
NC0462 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,997 $18,991 Implemented
NC0462 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $174 $220 Implemented
NC0462 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $528 $508 Not Implemented
SF0417 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,561 $0 Not Implemented
SF0417 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,459 $0 Implemented
SF0417 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $58 Not Implemented
SF0417 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,237 $239 Implemented
SF0417 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,829 $21,581 Not Implemented
SF0417 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,063 $2,490 Not Implemented
SF0417 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $6,916 $31,417 Implemented
SF0417 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,407 $16,180 Implemented
OR0574 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $35,460 $21,200 Not Implemented
OR0574 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,450 $7,166 Implemented
OR0574 # 03 Y:2011 03 2011 REDUCE FLUID FLOW RATES $9,209 $15,000 Not Implemented
OR0574 # 04 Y:2011 04 2011 REDUCE FLUID FLOW RATES $13,265 $25,000 Not Implemented
OR0574 # 05 Y:2011 05 2011 REDUCE FLUID FLOW RATES $4,812 $18,000 Not Implemented
OR0574 # 06 Y:2011 06 2011 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $8,495 $18,038 Not Implemented
OR0574 # 07 Y:2011 07 2011 ADOPT IN-HOUSE MATERIAL GENERATION $228,949 $487,000 Not Implemented