IAC Assessment: NC0462
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0462
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Doors
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 210,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $253,557 6,051,939 kWh $0.04
Electricity Demand $149,567 14,830 kW-months/year $10.09
Electricity Fees $2,051 - $ -
Natural Gas $124,775 12,670 MMBtu $9.85
TOTAL ENERGY COSTS $529,950
RECOMMENDED SAVINGS* $194,949 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,541
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$21,080
Cost:
$25,000
$12,847 308,824 $8,233 806 - - - - - - - - $12,847
308,824
kWh
$8,233
806
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$107,890
Cost:
$305,000
- - - - $112,890 11,043 - - - - $(-5,000) - -
-
kWh
-
-
kW-months/year
$112,890
11,043
MMBtu
-
-
$
-
-
$
$(-5,000)
-
$
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$8,910
Cost:
$20,000
- - - - $8,910 900 - - - - - - -
-
kWh
-
-
kW-months/year
$8,910
900
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,190
Cost:
$400
$4,283 102,948 $2,747 269 - - $(-600) - - - $(-240) - $4,283
102,948
kWh
$2,747
269
kW-months/year
-
-
MMBtu
$(-600)
-
$
-
-
$
$(-240)
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$102
Cost:
$200
$62 1,491 $40 4 - - - - - - - - $62
1,491
kWh
$40
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,686
Cost:
$11,000
$(-143) (-3,435) $(-91) (-9) $7,920 800 - - - - - - $(-143)
(-3,435)
kWh
$(-91)
(-9)
kW-months/year
$7,920
800
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$36,392
Cost:
$8,400
$22,492 534,262 $14,244 1,394 - - - - $(-344) - - - $22,492
534,262
kWh
$14,244
1,394
kW-months/year
-
-
MMBtu
-
-
$
$(-344)
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,997
Cost:
$18,991
$3,601 85,524 $2,396 234 - - - - - - - - $3,601
85,524
kWh
$2,396
234
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$174
Cost:
$220
$56 1,327 $78 8 - - - - - - $40 - $56
1,327
kWh
$78
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$40
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$528
Cost:
$508
$157 3,718 $52 5 - - - - - - $319 - $157
3,718
kWh
$52
5
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$319
-
$
TOTAL RECOMMENDED Savings:
$194,949
Cost:
$389,719
$43,355 1,034,659 $27,699 2,711 $129,720 12,743 $(-600) - $(-344) - $(-4,881) - $43,355
1,034,659
kWh
$27,699
2,711
kW-months/year
$129,720
12,743
MMBtu
$(-600)
-
$
$(-344)
-
$
$(-4,881)
-
$
TOTAL IMPLEMENTED Savings:
$56,541
Cost:
$39,211
$30,351 722,117 $19,414 1,900 $7,920 800 $(-600) - $(-344) - $(-200) - $30,351
722,117
kWh
$19,414
1,900
kW-months/year
$7,920
800
MMBtu
$(-600)
-
$
$(-344)
-
$
$(-200)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost