Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
384
matching recommendationsNAICS | 321918 | Other Millwork (including Flooring) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2427 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,216 | $90 | n/a |
KS2427 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,324 | $5,480 | n/a |
KS2427 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM THICKNESS INSULATION | $9,550 | $6,688 | n/a |
KS2427 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,928 | $156,644 | n/a |
KS2427 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,498 | $453,376 | n/a |
KS2427 # 04 Y:2024 | 04 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $69,076 | $156,917 | n/a |
NL0091 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $28,330 | $57,285 | Implemented |
NL0091 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,289 | $11,473 | Implemented |
NL0091 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,370 | $1,500 | Implemented |
NL0091 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $507 | $1,064 | Not Implemented |
NL0091 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $216 | $128 | Not Implemented |
WV0655 # 01 Y:2023 | 01 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $50,347 | $17,230 | Not Implemented |
WV0655 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,873 | $10,662 | Not Implemented |
WV0655 # 02 Y:2023 | 02 | 2023 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $39,676 | $165,000 | Not Implemented |
WV0655 # 10 Y:2023 | 10 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,641 | $210 | Implemented |
WV0655 # 03 Y:2023 | 03 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,350 | $1,500 | Implemented |
WV0655 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $4,078 | $12,517 | Implemented |
WV0655 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $8,192 | $5,240 | Implemented |
WV0655 # 09 Y:2023 | 09 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,005 | $7,828 | Implemented |
WV0655 # 11 Y:2023 | 11 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $324 | $359 | Implemented |
WV0655 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $6,154 | $4,905 | Not Implemented |
WV0655 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $11,948 | $11,050 | Not Implemented |
TT0301 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $47,506 | $76,760 | Not Implemented |
TT0301 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,720 | $15,200 | Implemented |
TT0301 # 02 Y:2023 | 02 | 2023 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $40,702 | $210,000 | Not Implemented |