IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

384

matching recommendations
Reset
NAICS 321918 Other Millwork (including Flooring)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0317 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $913 $100 Implemented
NC0317 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $748 $924 Implemented
NC0317 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $1,847 Implemented
NC0317 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $954 $358 Not Implemented
MI0106 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $19,885 $760 Implemented
MI0106 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,649 $12,563 Not Implemented
MI0106 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $6,418 $225 Implemented
MI0106 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $862 Implemented
MI0106 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,390 $56 Implemented
MI0106 # 06 Y:2005 06 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $834 $600 Not Implemented
MI0106 # 07 Y:2005 07 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $756 $1,536 Not Implemented
NC0279 # 01 Y:2004 01 2004 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $3,220 $20,000 Implemented
NC0279 # 02 Y:2004 02 2004 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $25,415 $25,000 Not Implemented
NC0279 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,096 $1,875 Implemented
NC0279 # 04 Y:2004 04 2004 $59,248 $6,000 Implemented
NC0279 # 05 Y:2004 05 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,880 $9,200 Not Implemented
NC0279 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $120 Not Implemented
NC0279 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $253 $775 Not Implemented
NC0279 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $68 $80 Not Implemented
OR0444 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $967,810 $181,200 Implemented
OR0444 # 02 Y:2003 02 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $30,800 $2,000 Not Implemented
OR0444 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,210 $8,170 Implemented
OR0444 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,600 $18,610 Not Implemented
AS0364 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,347 $7,928 Not Implemented
AS0364 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $221 $524 Not Implemented