Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2005
Principal Product Engineered hardwood flooring
NAICS 321918 - Other Millwork (including Flooring)
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 300,000
Annual Production 33,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $213,082 9,565,920 kWh $0.02
Electricity Demand $140,235 17,297 kW-months/year $8.11
Natural Gas $159,964 15,037 MMBtu $10.64
TOTAL ENERGY COSTS $513,281
RECOMMENDED SAVINGS* $134,452 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $133,498
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$10,821
Cost:
$1,000
- - - - $10,821 1,017 - - - - -
-
kWh
-
-
kW-months/year
$10,821
1,017
MMBtu
-
-
$
-
-
$
02: 2.2123 INSULATE FEEDWATER TANK Savings:
$2,381
Cost:
$1,000
- - - - $2,381 224 - - - - -
-
kWh
-
-
kW-months/year
$2,381
224
MMBtu
-
-
$
-
-
$
03: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$116,959
Cost:
$53,625
$(-33,530) (-838,260) $(-9,475) 1,148 $159,964 15,073 - - - - $(-33,530)
(-838,260)
kWh
$(-9,475)
1,148
kW-months/year
$159,964
15,073
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$913
Cost:
$100
$1,413 35,337 $700 85 - - $(-900) - $(-300) - $1,413
35,337
kWh
$700
85
kW-months/year
-
-
MMBtu
$(-900)
-
$
$(-300)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$748
Cost:
$924
$555 13,885 $193 23 - - - - - - $555
13,885
kWh
$193
23
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,676
Cost:
$1,847
$1,295 32,371 $381 46 - - - - - - $1,295
32,371
kWh
$381
46
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$954
Cost:
$358
$954 23,856 - - - - - - - - $954
23,856
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$134,452
Cost:
$58,854
$(-29,313) (-732,811) $(-8,201) 1,302 $173,166 16,314 $(-900) - $(-300) - $(-29,313)
(-732,811)
kWh
$(-8,201)
1,302
kW-months/year
$173,166
16,314
MMBtu
$(-900)
-
$
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$133,498
Cost:
$58,496
$(-30,267) (-756,667) $(-8,201) 1,302 $173,166 16,314 $(-900) - $(-300) - $(-30,267)
(-756,667)
kWh
$(-8,201)
1,302
kW-months/year
$173,166
16,314
MMBtu
$(-900)
-
$
$(-300)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material