IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
NAICS 32192 Wood Container and Pallet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0211 # 05 Y:2016 05 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $150,150 $1,435,000 Not Implemented
UA3029 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $24,921 $9,630 Not Implemented
UA3029 # 02 Y:2013 02 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,202 $7,598 Not Implemented
UA3029 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,059 $800 Implemented
UA3029 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $858 $1,060 Implemented
UA3029 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,101 $907 Not Implemented
UA3029 # 06 Y:2013 06 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,023 $330 Implemented
WV0466 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,182 $32,900 Not Implemented
WV0466 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $15,207 $35,976 Implemented
WV0466 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,380 $0 Not Implemented
WV0466 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,321 $1,000 Not Implemented
WV0466 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,752 $3,840 Not Implemented
WV0466 # 06 Y:2013 06 2013 OPTIMIZE PLANT POWER FACTOR $3,614 $5,600 Not Implemented
WV0466 # 07 Y:2013 07 2013 BURN WASTE OIL FOR HEAT $2,530 $4,000 Not Implemented
WV0466 # 08 Y:2013 08 2013 IMPROVE LUBRICATION PRACTICES $2,167 $1,000 Implemented
WV0466 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,160 $488 Implemented
WV0466 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,248 $30 Implemented
WV0466 # 11 Y:2013 11 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,129 $5,550 Not Implemented
WV0466 # 12 Y:2013 12 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,001 $113 Implemented
WV0466 # 13 Y:2013 13 2013 DEVELOP A REPAIR/REPLACE POLICY $477 $470 Implemented
SF0421 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,912 $0 Not Implemented
SF0421 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,017 $0 Implemented
SF0421 # 03 Y:2012 03 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,494 $10,564 Not Implemented
SF0421 # 04 Y:2012 04 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,965 $104,550 Not Implemented
SF0421 # 05 Y:2012 05 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,801 $22,991 Implemented