Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsNAICS | 32199 | All Other Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0141 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $1,100 | Not Implemented |
BS0141 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,094 | $50 | Not Implemented |
BS0141 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $903 | $3,300 | Not Implemented |
BS0141 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,407 | $70,150 | Not Implemented |
BS0141 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $68 | $55 | Not Implemented |
BS0141 # 06 Y:2020 | 06 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $36,736 | $27,300 | Not Implemented |
BS0090 # 04 Y:2016 | 04 | 2016 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $942 | $1,373 | Implemented |
BS0090 # 03 Y:2016 | 03 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,077 | $2,600 | Not Implemented |
BS0090 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,391 | $2,653 | Implemented |
BS0090 # 01 Y:2016 | 01 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,027 | $1,820 | Implemented |
BS0090 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $395 | $254 | Implemented |
BS0090 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $283 | $274 | Not Implemented |
BS0090 # 07 Y:2016 | 07 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $30 | $15 | Not Implemented |
BS0089 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,615 | $4,480 | Not Implemented |
BS0089 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,855 | $654 | Not Implemented |
BS0089 # 07 Y:2016 | 07 | 2016 | OPTIMIZE PLANT POWER FACTOR | $15,910 | $115,903 | Not Implemented |
BS0089 # 06 Y:2016 | 06 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,303 | $1,200 | Not Implemented |
BS0089 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,610 | $15,011 | Not Implemented |
BS0089 # 01 Y:2016 | 01 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,075 | $353 | Not Implemented |
BS0089 # 02 Y:2016 | 02 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $7,566 | $6,400 | Not Implemented |
BS0089 # 05 Y:2016 | 05 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,760 | $4,580 | Not Implemented |
BS0082 # 06 Y:2016 | 06 | 2016 | COMBINE UTILITY METERS | $63 | $60 | Not Implemented |
BS0082 # 05 Y:2016 | 05 | 2016 | REDESIGN PROCESS | $1,906 | $1,953 | Implemented |
BS0082 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $366 | $2,240 | Not Implemented |
BS0082 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $146 | $300 | Implemented |