Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,028
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0687 # 01 Y:2025 | 01 | 2025 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $11,496 | $6,800 | n/a |
WV0687 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $192 | $572 | n/a |
WV0687 # 03 Y:2025 | 03 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,689 | $3,615 | n/a |
WV0687 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,592 | $7,384 | n/a |
WV0687 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $828 | $937 | n/a |
WV0687 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $2,726 | $1,870 | n/a |
WV0687 # 05 Y:2025 | 05 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $898 | $3,200 | n/a |
LE0600 # 06 Y:2025 | 06 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $14,877 | $20,000 | n/a |
LE0600 # 05 Y:2025 | 05 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,757 | $2,500 | n/a |
LE0600 # 09 Y:2025 | 09 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,420 | $4,000 | n/a |
LE0600 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,082 | $0 | n/a |
LE0600 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,149 | $2,600 | n/a |
LE0600 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $6,925 | $420 | n/a |
LE0600 # 10 Y:2025 | 10 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,545 | $9,511 | n/a |
LE0600 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $92,399 | $480 | n/a |
LE0600 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,555 | $7,500 | n/a |
LE0600 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,572 | $26,690 | n/a |
NL0110 # 04 Y:2025 | 04 | 2025 | METER WASTE WATER | $4,494 | $2,400 | n/a |
NL0110 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $262,812 | $4,671,994 | n/a |
NL0110 # 05 Y:2025 | 05 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $527 | $700 | n/a |
NL0110 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,063 | $4,500 | n/a |
NL0110 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,360 | $160 | n/a |
WM0241 # 04 Y:2025 | 04 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $552 | $635 | n/a |
WM0241 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,950 | $0 | n/a |
WM0241 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,471 | $2,249 | n/a |