IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0077 # 04 Y:2004 04 2004 RECOVER AND REUSE COOLING WATER $4,087 $1,685 Not Implemented
TA0077 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,474 $840 Not Implemented
NC0301 # 01 Y:2004 01 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $39,250 $10,000 Not Implemented
NC0301 # 02 Y:2004 02 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $32,270 $2,500 Not Implemented
NC0301 # 03 Y:2004 03 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,891 $17,930 Not Implemented
NC0301 # 04 Y:2004 04 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $17,538 $27,880 Not Implemented
NC0301 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,961 $3,154 Not Implemented
NC0301 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $812 $100 Not Implemented
MS0261 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,624 $25,372 Not Implemented
MS0261 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,290 $15,000 Not Implemented
MS0261 # 03 Y:2004 03 2004 USE RADIANT HEATER FOR SPOT HEATING $6,881 $3,275 Not Implemented
MS0261 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,978 $2,968 Not Implemented
MS0261 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,530 $1,992 Not Implemented
MS0261 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,883 $0 Not Implemented
MS0261 # 07 Y:2004 07 2004 REPAIR AND ELIMINATE STEAM LEAKS $1,491 $19 Not Implemented
MS0261 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,148 $3,031 Not Implemented
MS0261 # 09 Y:2004 09 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $881 $66 Not Implemented
MA0559 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $239,059 $699,000 Not Implemented
MA0559 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $70,580 $123,500 Not Implemented
MA0559 # 03 Y:2004 03 2004 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $36,905 $15,475 Implemented
MA0559 # 04 Y:2004 04 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,513 $4,078 Not Implemented
MA0559 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,349 $11,346 Implemented
MA0559 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,861 $14,400 Not Implemented
MA0559 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,383 $333 Not Implemented
CO0549 # 01 Y:2004 01 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $29,210 $116,000 Not Implemented