IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0764 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $1,390 Not Implemented
AM0764 # 06 Y:2018 06 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $720 $8 Implemented
AM0764 # 07 Y:2018 07 2018 PAY UTILITY BILLS ON TIME $715 $0 Implemented
AM0764 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $8 Not Implemented
AM0764 # 09 Y:2018 09 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $340 $130 Not Implemented
SU0465 # 01 Y:2018 01 2018 PAY BILLS ON TIME TO AVOID LATE FEES $5,667 $0 Implemented
SU0465 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,600 $0 Implemented
SU0465 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,792 $0 Not Implemented
SU0465 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,746 $1,021 Not Implemented
SU0465 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,183 $740 Implemented
SU0465 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,797 $5,696 Implemented
SU0465 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79 $105 Not Implemented
SU0465 # 08 Y:2018 08 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $146 $361 Not Implemented
SU0465 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $452 $1,526 Not Implemented
SU0465 # 10 Y:2018 10 2018 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $23,316 $98,239 Not Implemented
MA0792 # 01 Y:2018 01 2018 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $158,611 $1,000,000 Not Implemented
MA0792 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,850 $16,551 Implemented
MA0792 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,711 $9,925 Implemented
MA0792 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,744 $3,340 Not Implemented
MA0791 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,318 $264,000 Not Implemented
MA0791 # 02 Y:2018 02 2018 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $16,275 $1,000 Not Implemented
MA0791 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $1,313 $238 Implemented
MA0791 # 04 Y:2018 04 2018 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $974 $1,000 Implemented
MA0791 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $434 $200 Not Implemented
WM0125 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,273 $13,601 Not Implemented