IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0688 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,165 $0 Not Implemented
UK1704 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,480 $18,700 Implemented
UK1704 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,401 $43,120 Implemented
UK1704 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,970 $0 Implemented
UK1704 # 04 Y:2017 04 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $36,644 $16,350 Not Implemented
UK1704 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,541 $0 Implemented
UK1704 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,756 $5,320 Implemented
UK1704 # 07 Y:2017 07 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $9,390 $9,300 Implemented
UK1704 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $5,402 $8,550 Implemented
UK1704 # 09 Y:2017 09 2017 USE PHOTOCELL CONTROLS $1,262 $630 Not Implemented
UK1704 # 10 Y:2017 10 2017 CLEAN CONDENSER TUBES $2,467 $650 Implemented
UK1704 # 11 Y:2017 11 2017 REDUCE FLUID FLOW RATES $2,428 $1,125 Not Implemented
UK1704 # 12 Y:2017 12 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $292 $775 Not Implemented
LE0434 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,784 $28 Implemented
LE0434 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,031 $1,000 Not Implemented
LE0434 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,560 $1,080 Implemented
LE0434 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $576 $300 Not Implemented
LE0434 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,921 $65,000 Not Implemented
LE0434 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,129 $5,350 Not Implemented
LE0434 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $483 $1,450 Implemented
LE0434 # 08 Y:2017 08 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,523 $40,000 Not Implemented
UD0964 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,083 $0 Not Implemented
UD0964 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $652 $500 Not Implemented
UD0964 # 03 Y:2017 03 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,847 $500 Not Implemented
UD0964 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,000 $1,000 Not Implemented