Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,971
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0287 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $300 | $108 | n/a |
UA0287 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $64 | $183 | n/a |
UA0287 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,926 | $1,000 | n/a |
UA0287 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,986 | $8,591 | n/a |
UA0287 # 06 Y:2024 | 06 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,375 | $8,397 | n/a |
UA0287 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,903 | $414,460 | n/a |
NT0029 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,179 | $5,609 | n/a |
NT0029 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,227 | $1,819 | n/a |
NT0029 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $34,386 | $117,351 | n/a |
NT0029 # 04 Y:2024 | 04 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $204,971 | $10,000 | n/a |
NT0029 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,550 | $21,900 | n/a |
KS2430 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $93,352 | $684,000 | n/a |
KS2430 # 05 Y:2024 | 05 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,954 | $60,601 | n/a |
KS2430 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,172 | $5,121 | n/a |
KS2430 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,174 | $9,216 | n/a |
KS2430 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,137 | $60 | n/a |
KS2430 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,570 | $460,976 | n/a |
NT0023 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,070 | $5,609 | n/a |
NT0023 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,899 | $15,284 | n/a |
NT0023 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $36,182 | $16,564 | n/a |
NT0023 # 04 Y:2024 | 04 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $7,720 | $0 | n/a |
NT0023 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,130 | $17,836 | n/a |
NT0023 # 06 Y:2024 | 06 | 2024 | CHANGE OPERATING CONDITIONS | $150,000 | $616,838 | n/a |
UF0612 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,066 | $2,320 | n/a |
UF0612 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $402,389 | $1,529,500 | n/a |