Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
155
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0095 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $6,024 | $600 | Not Implemented |
DL0095 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,056 | $700 | Not Implemented |
MAS030 # 06 Y:2012 | 06 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,098 | $500 | Not Implemented |
MAS030 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,333 | $4,400 | Not Implemented |
MAS030 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,379 | $0 | Implemented |
MAS030 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,092 | $0 | Implemented |
MAS030 # 02 Y:2012 | 02 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,241 | $1,500 | Not Implemented |
MAS030 # 01 Y:2012 | 01 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $8,427 | $2,500 | Not Implemented |
NC0465 # 07 Y:2012 | 07 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,419 | $16,000 | Not Implemented |
NC0465 # 06 Y:2012 | 06 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,959 | $3,000 | Implemented |
NC0465 # 05 Y:2012 | 05 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $512 | $0 | Implemented |
NC0465 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,645 | $45,006 | Implemented |
NC0465 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,615 | $10,250 | Not Implemented |
NC0465 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,440 | $200 | Not Implemented |
NC0465 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $400 | Implemented |
NC0465 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,343 | $1,200 | Implemented |
NC0465 # 09 Y:2012 | 09 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,179 | $1,000 | Implemented |
NC0465 # 10 Y:2012 | 10 | 2012 | INSULATE FEEDWATER TANK | $464 | $1,150 | Implemented |
NC0465 # 11 Y:2012 | 11 | 2012 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $1,007 | $1,000 | Implemented |
DL0091 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,180 | $1,500 | Not Implemented |
DL0091 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,770 | $300 | Implemented |
DL0091 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,580 | $2,500 | Implemented |
DL0091 # 09 Y:2012 | 09 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,030 | $300 | Not Implemented |
DL0091 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,450 | $39,400 | Not Implemented |
DL0091 # 10 Y:2012 | 10 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,810 | $325 | Not Implemented |