IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0329 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $15,947 $2,318 Not Implemented
SU0329 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $12,564 $14,335 Not Implemented
SU0329 # 04 Y:2013 04 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $575 $1,669 Not Implemented
SU0329 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $19,420 $59,981 Not Implemented
SU0326 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,463 $0 Implemented
SU0326 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,393 $2,291 Implemented
SU0326 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148 $59 Implemented
SU0326 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $4,743 $2,736 Not Implemented
SU0326 # 05 Y:2012 05 2012 ELIMINATE/REDUCE AN OPERATION $8,342 $8,640 Not Implemented
SU0326 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,568 $7,264 Not Implemented
SU0326 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,280 $3,077 Implemented
SU0326 # 08 Y:2012 08 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $542 $732 Not Implemented
SU0326 # 09 Y:2012 09 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $61,559 $262,789 Implemented
BD0419 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,031 $31,529 Implemented
BD0419 # 02 Y:2012 02 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $10,810 $14,000 Not Implemented
BD0419 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,421 $7,300 Implemented
BD0419 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $929 $1,200 Implemented
BD0419 # 05 Y:2012 05 2012 USE SYNTHETIC LUBRICANT $849 $500 Not Implemented
BD0419 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $820 $20 Not Implemented
BD0419 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $648 $220 Not Implemented
BD0419 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $642 $600 Not Implemented
BD0419 # 09 Y:2012 09 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $421 $700 Implemented
AM0625 # 01 Y:2012 01 2012 INSTALL SKYLIGHTS $5,900 $6,720 Not Implemented
AM0625 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,745 $605 Not Implemented
AM0625 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $500 Not Implemented