IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0080 # 09 Y:2012 09 2012 INSTALL OCCUPANCY SENSORS $6,200 $121 Not Implemented
UA0075 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,801 $2,400 Implemented
UA0075 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,710 $800 Not Implemented
UA0075 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $7,097 $2,040 Implemented
UA0075 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,398 $2,039 Not Implemented
UA0075 # 05 Y:2012 05 2012 USE OPTIMUM THICKNESS INSULATION $362 $84 Not Implemented
UA0075 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $808 $398 Implemented
UA0075 # 07 Y:2012 07 2012 USE RADIANT HEATER FOR SPOT HEATING $16,122 $8,865 Not Implemented
UA0075 # 08 Y:2012 08 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,048 $930 Not Implemented
DL0078 # 01 Y:2011 01 2011 REPLACE BOILER $123,207 $900,000 Not Implemented
DL0078 # 02 Y:2011 02 2011 USE RADIANT HEATER FOR SPOT HEATING $191,452 $500,000 Not Implemented
DL0078 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,553 $42,800 Not Implemented
DL0078 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,285 $28,500 Not Implemented
DL0078 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,872 $165,720 Not Implemented
DL0078 # 06 Y:2011 06 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $14,637 $800 Not Implemented
DL0078 # 07 Y:2011 07 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $77,835 $42,650 Implemented
DL0078 # 08 Y:2011 08 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $23,761 $22,500 Not Implemented
MA0684 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $23,122 $40,000 Implemented
MA0684 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $14,891 $3,700 Implemented
MA0684 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,358 $15,000 Implemented
MA0684 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,744 $0 Not Implemented
MA0684 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $3,360 $10,625 Not Implemented
MA0684 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $2,502 $2,200 Implemented
MA0684 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,402 $2,100 Implemented
MAS013 # 01 Y:2011 01 2011 UPGRADE OBSOLETE EQUIPMENT $27,730 $42,112 Not Implemented