IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,915

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0637 # 11 Y:2008 11 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,939 $10,400 Not Implemented
MA0637 # 12 Y:2008 12 2008 USE GRAVITY FEEDS WHEREVER POSSIBLE $455 $500 Not Implemented
MA0636 # 01 Y:2008 01 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $221,387 $110,000 Not Implemented
MA0636 # 02 Y:2008 02 2008 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $147,853 $540,000 Not Implemented
MA0636 # 03 Y:2008 03 2008 USE EXISTING DAM TO GENERATE ELECTRICITY $110,112 $939,500 Implemented
MA0636 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,946 $18,000 Implemented
MA0636 # 05 Y:2008 05 2008 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $8,663 $5,000 Not Implemented
MA0636 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,272 $0 Not Implemented
MA0636 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,142 $20,000 Not Implemented
AM0544 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,200 $42,370 Implemented
AM0544 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,350 $2,500 Implemented
AM0544 # 03 Y:2008 03 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $16,810 $0 Implemented
AM0544 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,200 $24,000 Implemented
AM0544 # 05 Y:2008 05 2008 PAY UTILITY BILLS ON TIME $6,800 $0 Implemented
AM0544 # 06 Y:2008 06 2008 USE SYNTHETIC LUBRICANT $1,885 $0 Implemented
AM0544 # 07 Y:2008 07 2008 REUSE RAGS UNTIL COMPLETELY SOILED $1,040 $0 Implemented
AM0544 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $385 $0 Implemented
UA0017 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,380 $0 Implemented
UA0017 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $59,923 $1,050 Implemented
UA0017 # 03 Y:2008 03 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $33,016 $402 Implemented
UA0017 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $5,880 $314 Implemented
UA0017 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,989 $0 Implemented
UF0408 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,980 $15,208 Not Implemented
UF0408 # 02 Y:2008 02 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,404 $870 Implemented
UF0408 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,339 $1,246 Implemented