Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,190
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0019 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,885 | $164 | Implemented |
IP0019 # 01 Y:2013 | 01 | 2013 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,290 | $0 | Not Implemented |
IP0019 # 02 Y:2013 | 02 | 2013 | APPLY FOR INVESTMENT INCENTIVES | $166 | $0 | Not Implemented |
IP0019 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,889 | $3,258 | Implemented |
IP0019 # 07 Y:2013 | 07 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $640 | $957 | Not Implemented |
IP0019 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $493 | $0 | Implemented |
IP0019 # 05 Y:2013 | 05 | 2013 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $668 | $715 | Not Implemented |
UD0894 # 01 Y:2013 | 01 | 2013 | USE MINIMUM COOLING WATER TO BEARINGS | $17,378 | $0 | Not Implemented |
UD0894 # 07 Y:2013 | 07 | 2013 | INSULATE BARE EQUIPMENT | $142 | $350 | Implemented |
UD0894 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,426 | $0 | Not Implemented |
UD0894 # 09 Y:2013 | 09 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,400 | $40,600 | Not Implemented |
UD0894 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,638 | $10,000 | Not Implemented |
UD0894 # 08 Y:2013 | 08 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $12,240 | $30,550 | Not Implemented |
UD0894 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $17,944 | $8,000 | Not Implemented |
UD0894 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,290 | $0 | Implemented |
UD0894 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,885 | $0 | Implemented |
CO0680 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,930 | $1,310 | Implemented |
CO0680 # 03 Y:2013 | 03 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $490 | $230 | Implemented |
CO0680 # 02 Y:2013 | 02 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,370 | $31,720 | Not Implemented |
BD0432 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,312 | $500 | Not Implemented |
BD0432 # 06 Y:2013 | 06 | 2013 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $212 | $40 | Not Implemented |
BD0432 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $378 | $20 | Not Implemented |
BD0432 # 02 Y:2013 | 02 | 2013 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $6,185 | $16,000 | Not Implemented |
BD0432 # 03 Y:2013 | 03 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,832 | $4,800 | Not Implemented |
BD0432 # 01 Y:2013 | 01 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $9,498 | $14,512 | Not Implemented |