Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0092 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $580 | $105 | Not Implemented |
NL0092 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,226 | $2,000 | Implemented |
NL0092 # 05 Y:2023 | 05 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $665 | $1,360 | Implemented |
NL0092 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,380 | $140 | Implemented |
NL0092 # 04 Y:2023 | 04 | 2023 | COMBINE UTILITY METERS | $948 | $1,000 | Not Implemented |
NL0092 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,092 | $3,305 | Not Implemented |
CC0033 # 04 Y:2023 | 04 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,017 | $3,056 | n/a |
CC0033 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,410 | $15,880 | n/a |
CC0033 # 01 Y:2023 | 01 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $156,555 | $230,000 | n/a |
CC0033 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $50,160 | $549,139 | n/a |
CC0033 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,026 | $0 | n/a |
UA0278 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,473 | $64,976 | Not Implemented |
UA0278 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $9,308 | $327 | Implemented |
UA0278 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,819 | $1,680 | Not Implemented |
UA0278 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,935 | $1,000 | Not Implemented |
UA0278 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,416 | $8,163 | Implemented |
UA0278 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $777 | $4,000 | Implemented |
UA0278 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,770 | $1,055 | Not Implemented |
UA0278 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $83,920 | $6,036 | Implemented |
NT0014 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,483 | $1,258 | Implemented |
NT0014 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,512 | $0 | Implemented |
NT0014 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,486 | $1,441 | Implemented |
NT0014 # 02 Y:2023 | 02 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,006 | $6,160 | Implemented |
NT0014 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $955 | $0 | Implemented |
UA0272 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $10,163 | $4,516 | Not Implemented |