Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0244 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $354,000 | $3,000,000 | n/a |
DL0244 # 05 Y:2024 | 05 | 2024 | METER WASTE WATER | $7,907 | $2,000 | n/a |
DL0244 # 01 Y:2024 | 01 | 2024 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $6,357 | $1,000 | n/a |
DL0244 # 02 Y:2024 | 02 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,768 | $0 | n/a |
DL0244 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,165 | $5,000 | n/a |
DL0244 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,278 | $20,000 | n/a |
MZ0367 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,464 | $5,400 | n/a |
MZ0367 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,498 | $12,000 | n/a |
MZ0367 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,987 | $1,000 | n/a |
MZ0367 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $852 | $400 | n/a |
MZ0367 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,969 | $3,120 | n/a |
NT0033 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,068 | $5,609 | n/a |
NT0033 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $732 | $0 | n/a |
NT0033 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $309 | $403 | n/a |
NT0033 # 04 Y:2024 | 04 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $7,104 | $10,000 | n/a |
NT0033 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $150,000 | $200,000 | n/a |
LE0583 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,189 | $49,500 | Not Implemented |
LE0583 # 06 Y:2024 | 06 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,627,510 | $8,755,000 | Not Implemented |
LE0583 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,716 | $10,250 | Not Implemented |
LE0583 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $19,014 | $7,000 | Implemented |
LE0583 # 03 Y:2024 | 03 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $344,366 | $63,000 | Implemented |
LE0583 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,430 | $2,300 | Implemented |
LE0583 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,486 | $0 | Not Implemented |
UA0287 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,903 | $414,460 | n/a |
UA0287 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $6,007 | $1,191 | n/a |