IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

674

matching recommendations
Reset
NAICS 3221 Pulp, Paper, and Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0495 # 09 Y:2005 09 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $242 $200 Implemented
WI0495 # 07 Y:2005 07 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,135 $1,500 Implemented
WI0495 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,800 $1,280 Not Implemented
WI0495 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $162,672 $360,000 Not Implemented
WI0495 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,256 $32,760 Implemented
WI0495 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,320 $360 Implemented
WI0495 # 04 Y:2005 04 2005 INSTALL AUTOMATIC STACK DAMPER $2,655 $3,400 Not Implemented
WI0495 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,165 $0 Implemented
AM0487 # 01 Y:2005 01 2005 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $108,000 $24,500 Not Implemented
AM0487 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $27,000 $61,600 Not Implemented
AM0487 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,460 $500 Not Implemented
AM0487 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $10,400 $1,200 Not Implemented
AM0487 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $2,600 $100 Not Implemented
AM0487 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,700 $2,100 Not Implemented
AM0487 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $920 $500 Not Implemented
AM0487 # 08 Y:2005 08 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,940 $4,200 Not Implemented
UM0276 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,572 $2,500 Implemented
UM0276 # 01 Y:2005 01 2005 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $206,100 $96,000 Implemented
UM0276 # 03 Y:2005 03 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $663,486 $7,500,000 Not Implemented
MA0567 # 01 Y:2004 01 2004 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $70,900 $270,000 Implemented
MA0567 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $61,633 $54,474 Not Implemented
MA0567 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,220 $11,950 Not Implemented
MA0567 # 04 Y:2004 04 2004 $8,762 $1,000 Implemented
MA0567 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $4,156 $6,867 Implemented
MA0567 # 06 Y:2004 06 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,942 $5,000 Not Implemented