IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

691

matching recommendations
Reset
NAICS 3221 Pulp, Paper, and Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1917 # 01 Y:2019 01 2019 PAY UTILITY BILLS ON TIME $27,657 $0 Implemented
LS1917 # 02 Y:2019 02 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,335 $175 Not Implemented
LS1917 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,748 $535 Not Implemented
LS1917 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,391 $0 Implemented
LS1917 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $132,076 $93,000 Not Implemented
LS1917 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,652 $49,919 Implemented
AM0787 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $399 $280 Not Implemented
AM0787 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,577 $2,640 Implemented
AM0787 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,322 $825 Implemented
AM0787 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $70,814 $178,864 Implemented
AM0787 # 04 Y:2019 04 2019 USE SYNTHETIC LUBRICANT $13,271 $14,560 Implemented
AM0787 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $56,595 $10,440 Implemented
AM0787 # 02 Y:2019 02 2019 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $312,044 $849,614 Not Implemented
AM0787 # 01 Y:2019 01 2019 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $290,927 $1,011,274 Not Implemented
WV0580 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $265,061 $31,000 Not Implemented
WV0580 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $143,962 $6,000 Implemented
WV0580 # 03 Y:2019 03 2019 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $52,590 $160,314 Not Implemented
WV0580 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $8,437 $15,360 Implemented
WV0580 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $2,238 $2,550 Implemented
WV0580 # 06 Y:2019 06 2019 REPAIR OR REPLACE STEAM TRAPS $1,791 $5,731 Implemented
AS0470 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $680,774 $3,152,400 Implemented
AS0470 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $19,947 $40,400 Implemented
AS0470 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,843 $10,895 Implemented
AS0470 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $12,345 $516 Implemented
AS0470 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,823 $3,204 Implemented