IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 3221 Pulp, Paper, and Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0524 # 09 Y:2022 09 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $166,416 $500,000 Not Implemented
LE0524 # 08 Y:2022 08 2022 ELIMINATE A BY-PRODUCT $1,467,534 $3,000,000 Not Implemented
LE0524 # 07 Y:2022 07 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $247,341 $500,000 Not Implemented
LE0524 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,341 $2,100 Not Implemented
LE0524 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,876 $25,340 Not Implemented
LE0524 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,786 $5,740 Not Implemented
LE0524 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,133 $7,750 Implemented
LE0524 # 02 Y:2022 02 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $131,350 $40,000 Implemented
LE0524 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,559 $100 Not Implemented
LE0524 # 10 Y:2022 10 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,992 $24,000 Not Implemented
LE0524 # 11 Y:2022 11 2022 REPLACE BOILER $461,406 $4,000,000 Implemented
DL0078 # 06 Y:2011 06 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $14,637 $800 Not Implemented
DL0078 # 01 Y:2011 01 2011 REPLACE BOILER $123,207 $900,000 Not Implemented
DL0078 # 02 Y:2011 02 2011 USE RADIANT HEATER FOR SPOT HEATING $191,452 $500,000 Not Implemented
DL0078 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,553 $42,800 Not Implemented
DL0078 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,285 $28,500 Not Implemented
DL0078 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,872 $165,720 Not Implemented
DL0078 # 07 Y:2011 07 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $77,835 $42,650 Implemented
DL0078 # 08 Y:2011 08 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $23,761 $22,500 Not Implemented
LE0236 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,742 $300 Not Implemented
LE0236 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,063 $2,750 Not Implemented
LE0236 # 05 Y:2006 05 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,083 $2,500 Implemented
LE0236 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $22,758 $42,650 Not Implemented
LE0236 # 03 Y:2006 03 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $23,441 $17,600 Not Implemented
LE0236 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $123,125 $25,000 Not Implemented