Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
154
matching recommendationsNAICS | 3221 | Pulp, Paper, and Paperboard Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0590 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,681 | $301 | n/a |
LE0590 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,469 | $0 | n/a |
LE0590 # 12 Y:2025 | 12 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,407 | $29,000 | n/a |
LE0590 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,450 | $1,980 | n/a |
LE0590 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,020 | $3,696 | n/a |
LE0590 # 07 Y:2025 | 07 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,163 | $4,000 | n/a |
LE0590 # 10 Y:2025 | 10 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,004 | $30,293 | n/a |
LE0590 # 05 Y:2025 | 05 | 2025 | ELIMINATE A BY-PRODUCT | $24,310 | $16,420 | n/a |
LE0590 # 09 Y:2025 | 09 | 2025 | REPLACE BOILER | $109,410 | $550,000 | n/a |
LE0590 # 08 Y:2025 | 08 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,163 | $4,000 | n/a |
LE0590 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO HEAT WATER | $58,205 | $636,222 | n/a |
LE0590 # 11 Y:2025 | 11 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $173,183 | $1,591,750 | n/a |
NT0037 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,403 | $5,609 | n/a |
NT0037 # 04 Y:2025 | 04 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $482 | $0 | n/a |
NT0037 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,316 | $0 | n/a |
NT0037 # 05 Y:2025 | 05 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $94,336 | $5,000 | n/a |
NT0037 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $577 | $1,901 | n/a |
LE0583 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,430 | $2,300 | Implemented |
LE0583 # 03 Y:2024 | 03 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $344,366 | $63,000 | Implemented |
LE0583 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,486 | $0 | Not Implemented |
LE0583 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $19,014 | $7,000 | Implemented |
LE0583 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,716 | $10,250 | Not Implemented |
LE0583 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,189 | $49,500 | Not Implemented |
LE0583 # 06 Y:2024 | 06 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,627,510 | $8,755,000 | Not Implemented |
NT0029 # 04 Y:2024 | 04 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $204,971 | $10,000 | Implemented |