Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
460
matching recommendationsNAICS | 32212 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0583 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $19,014 | $7,000 | n/a |
LE0583 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,486 | $0 | n/a |
LE0583 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,430 | $2,300 | n/a |
LE0583 # 03 Y:2024 | 03 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $344,366 | $63,000 | n/a |
LE0583 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,716 | $10,250 | n/a |
LE0583 # 06 Y:2024 | 06 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,627,510 | $8,755,000 | n/a |
LE0583 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,189 | $49,500 | n/a |
UA0278 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $777 | $4,000 | n/a |
UA0278 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,935 | $1,000 | n/a |
UA0278 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,770 | $1,055 | n/a |
UA0278 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,416 | $8,163 | n/a |
UA0278 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,473 | $64,976 | n/a |
UA0278 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,819 | $1,680 | n/a |
UA0278 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $83,920 | $6,036 | n/a |
UA0278 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $9,308 | $327 | n/a |
UA0272 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,415 | $5,352 | n/a |
UA0272 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $10,163 | $4,516 | n/a |
UA0272 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $6,577 | $7,065 | n/a |
UA0272 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,741 | $1,120 | n/a |
UW2304 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $28,885 | $0 | Implemented |
UW2304 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $231 | $332 | Not Implemented |
UW2304 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,854 | $372 | Implemented |
UW2304 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $848 | $937 | Implemented |
UW2304 # 03 Y:2023 | 03 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $148,199 | $381,066 | Implemented |
GT0961 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $4,776 | $4,480 | Implemented |