Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 3222 | Converted Paper Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0886 # 05 Y:2011 | 05 | 2011 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $24,782 | $14,000 | Implemented |
GT0886 # 04 Y:2011 | 04 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $51,129 | $25,000 | Implemented |
GT0886 # 03 Y:2011 | 03 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $3,617 | $9,994 | Implemented |
GT0886 # 02 Y:2011 | 02 | 2011 | METER WASTE WATER | $5,529 | $2,500 | Implemented |
GT0886 # 01 Y:2011 | 01 | 2011 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $30,160 | $2,400 | Not Implemented |
GT0840 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,943 | $3,750 | Implemented |
GT0840 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $515 | $2,301 | Implemented |
GT0840 # 03 Y:2007 | 03 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,377 | $14,862 | Implemented |
GT0840 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,574 | $0 | Not Implemented |
GT0840 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,598 | $30,000 | Not Implemented |
GT0840 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $830 | $2,500 | Not Implemented |
GT0836 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $239,330 | $464,160 | Not Implemented |
GT0836 # 08 Y:2007 | 08 | 2007 | INSTALL OCCUPANCY SENSORS | $11,122 | $22,750 | Not Implemented |
GT0836 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,938 | $54,630 | Implemented |
GT0836 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,676 | $5,730 | Not Implemented |
GT0836 # 04 Y:2007 | 04 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,640 | $51,790 | Not Implemented |
GT0836 # 03 Y:2007 | 03 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,709 | $600 | Implemented |
GT0836 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,785 | $6,280 | Implemented |
GT0836 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $48,543 | $3,750 | Implemented |
GT0816 # 01 Y:2006 | 01 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $15,818 | $4,500 | Implemented |
GT0816 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,858 | $30,000 | Not Implemented |
GT0816 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,632 | $800 | Implemented |
GT0816 # 05 Y:2006 | 05 | 2006 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $31,493 | $25,500 | Not Implemented |
GT0816 # 04 Y:2006 | 04 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,351 | $5,122 | Implemented |
GT0816 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,196 | $1,422 | Implemented |