IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 3222 Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0111 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,680 $1,560 Not Implemented
UU0111 # 02 Y:2006 02 2006 INSTALL COMMON HEADER ON COMPRESSORS $1,760 $8,000 Not Implemented
UU0111 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $22,930 $20,000 Not Implemented
UU0111 # 06 Y:2006 06 2006 USE RADIANT HEATER FOR SPOT HEATING $3,330 $17,000 Not Implemented
UU0111 # 04 Y:2006 04 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,320 $605 Not Implemented
UU0111 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,860 $33,500 Not Implemented
UU0110 # 07 Y:2006 07 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $277,000 $7,378,000 Not Implemented
UU0110 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,440 $29,070 Not Implemented
UU0110 # 05 Y:2006 05 2006 $2,640 $0 Not Implemented
UU0110 # 04 Y:2006 04 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $126,380 $403,440 Not Implemented
UU0110 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,350 $6,900 Not Implemented
UU0110 # 02 Y:2006 02 2006 ISOLATE HOT OR COLD EQUIPMENT $4,260 $3,550 Not Implemented
UU0110 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,520 $2,095 Not Implemented
UU0097 # 02 Y:2006 02 2006 $177,372 $808,858 Not Implemented
UU0097 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $71,588 $180,000 Not Implemented
UU0097 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,113 $3,570 Not Implemented
UU0097 # 07 Y:2006 07 2006 INSTALL COMMON HEADER ON COMPRESSORS $1,960 $2,900 Not Implemented
UU0097 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $2,770 $1,500 Not Implemented
UU0097 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,191 $740 Not Implemented
UU0097 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $7,461 $4,840 Not Implemented
UU0097 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,790 $2,000 Not Implemented
UU0097 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $58,512 $25,405 Not Implemented
UU0069 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,879 $11,735 Implemented
UU0069 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,545 $2,000 Implemented
UU0069 # 06 Y:2004 06 2004 ELIMINATE/REDUCE AN OPERATION $76,000 $180,000 Not Implemented