Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
151
matching recommendationsNAICS | 32221 | Paperboard Container Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0357 # 08 Y:2008 | 08 | 2008 | SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE | $1,741 | $0 | Not Implemented |
SF0357 # 09 Y:2008 | 09 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $1,347 | $140 | Not Implemented |
SF0357 # 10 Y:2008 | 10 | 2008 | REPAIR OR REPLACE STEAM TRAPS | $3,011 | $294 | Not Implemented |
SF0357 # 11 Y:2008 | 11 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,263 | $2,834 | Not Implemented |
SF0357 # 12 Y:2008 | 12 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $8,305 | $25,703 | Not Implemented |
SF0357 # 13 Y:2008 | 13 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,817 | $15,233 | Not Implemented |
LM0094 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $500 | Implemented |
LM0094 # 02 Y:2005 | 02 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,502 | $983 | Implemented |
LM0094 # 03 Y:2005 | 03 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $57,780 | $50,000 | Implemented |
LM0094 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,187 | $34,080 | Not Implemented |
LM0094 # 05 Y:2005 | 05 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,628 | $0 | Not Implemented |
SD0356 # 01 Y:2005 | 01 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $5,391 | $11,000 | Implemented |
SD0356 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,992 | $14,000 | Implemented |
SD0356 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,583 | $7,647 | Not Implemented |
SD0356 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,351 | $120 | Implemented |
SD0356 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,151 | $0 | Not Implemented |
SD0356 # 06 Y:2005 | 06 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $18,769 | $25,650 | Not Implemented |
SD0356 # 07 Y:2005 | 07 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,230 | $18,500 | Not Implemented |
SD0332 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $164,104 | $609,600 | Not Implemented |
SD0332 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,679 | $475 | Implemented |
SD0332 # 03 Y:2004 | 03 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $2,765 | $900 | Implemented |
SD0332 # 04 Y:2004 | 04 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,750 | $6,000 | Not Implemented |
SD0332 # 05 Y:2004 | 05 | 2004 | INSTALL SKYLIGHTS | $3,460 | $7,015 | Not Implemented |
SF0257 # 01 Y:2003 | 01 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,122 | $353 | Implemented |
SF0257 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,000 | $0 | Implemented |