IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,433

matching recommendations
Reset
NAICS 32221 Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0358 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $383 $1,819 Not Implemented
AS0358 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,694 $310 Implemented
AS0358 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $88 $200 Not Implemented
AS0358 # 04 Y:2003 04 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $221 $32 Implemented
AS0358 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,266 $4,000 Implemented
AS0358 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,918 $140 Implemented
AS0358 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,222 $3,084 Implemented
AS0358 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $413 $862 Implemented
AS0358 # 09 Y:2003 09 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,109 $865 Implemented
AS0358 # 10 Y:2003 10 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $59,136 $4,060 Not Implemented
AS0358 # 11 Y:2003 11 2003 CLEAR AND RENT EXISTING SPACE $34,374 $12,148 n/a
GT0761 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,163 $0 Not Implemented
GT0761 # 02 Y:2003 02 2003 USE SYNTHETIC LUBRICANT $1,449 $0 Implemented
GT0761 # 03 Y:2003 03 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $3,569 $661 Not Implemented
GT0761 # 04 Y:2003 04 2003 INSULATE FEEDWATER TANK $1,440 $189 Implemented
GT0761 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,540 $300 Implemented
GT0761 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,599 $750 Implemented
GT0761 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,100 $2,400 Implemented
GT0761 # 08 Y:2003 08 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,317 $66,467 Implemented
GT0761 # 09 Y:2003 09 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,960 $0 Not Implemented
MA0533 # 01 Y:2003 01 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,237 $1,300 Not Implemented
MA0533 # 02 Y:2003 02 2003 REDUCE VENTILATION AIR $16,298 $34,450 Not Implemented
MA0533 # 03 Y:2003 03 2003 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $10,803 $25,625 Implemented
MA0533 # 04 Y:2003 04 2003 ADD AREA LIGHTING SWITCHES $8,645 $3,215 Implemented
MA0533 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $5,140 $15,455 Implemented