IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 32221 Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0430 # 01 Y:2010 01 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $264 $0 Not Implemented
SD0430 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,126 $1,029 Not Implemented
SD0430 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,949 $800 Implemented
SD0430 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,152 $100 Not Implemented
SD0430 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $1,671 Not Implemented
AS0409 # 07 Y:2005 07 2005 USE SOLAR HEAT TO HEAT WATER $1,555 $12,000 Not Implemented
AS0409 # 06 Y:2005 06 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,337 $1,000 Not Implemented
AS0409 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $1,730 $4,650 Not Implemented
AS0409 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,097 $10,861 Not Implemented
AS0409 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,055 $8,000 Not Implemented
AS0409 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $13,305 $10,000 Not Implemented
AS0409 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,404 $11,000 Not Implemented
AS0392 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,212 $16,893 Not Implemented
AS0392 # 07 Y:2005 07 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,689 $6,000 Not Implemented
AS0392 # 06 Y:2005 06 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $773 $700 Not Implemented
AS0392 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $2,942 $650 Not Implemented
AS0392 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,774 $4,055 Not Implemented
AS0392 # 02 Y:2005 02 2005 USE PLASTIC PALLETS INSTEAD OF WOOD $1,000,000 $217,560 Not Implemented
AS0392 # 01 Y:2005 01 2005 MODIFY CURRENT INCENTIVE PROGRAM $1,000,000 $891,000 Not Implemented
AS0358 # 09 Y:2003 09 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,109 $865 Implemented
AS0358 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $413 $862 Implemented
AS0358 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,918 $140 Implemented
AS0358 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,266 $4,000 Implemented
AS0358 # 04 Y:2003 04 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $221 $32 Implemented
AS0358 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $88 $200 Not Implemented