Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
411
matching recommendationsNAICS | 322211 | Corrugated and Solid Fiber Box Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0358 # 04 Y:2003 | 04 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $221 | $32 | Implemented |
AS0358 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,266 | $4,000 | Implemented |
AS0358 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,918 | $140 | Implemented |
AS0358 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,222 | $3,084 | Implemented |
AS0358 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $413 | $862 | Implemented |
AS0358 # 09 Y:2003 | 09 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,109 | $865 | Implemented |
GT0761 # 02 Y:2003 | 02 | 2003 | USE SYNTHETIC LUBRICANT | $1,449 | $0 | Implemented |
GT0761 # 04 Y:2003 | 04 | 2003 | INSULATE FEEDWATER TANK | $1,440 | $189 | Implemented |
GT0761 # 05 Y:2003 | 05 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,540 | $300 | Implemented |
GT0761 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,599 | $750 | Implemented |
GT0761 # 07 Y:2003 | 07 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,100 | $2,400 | Implemented |
GT0761 # 08 Y:2003 | 08 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,317 | $66,467 | Implemented |
MA0533 # 03 Y:2003 | 03 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $10,803 | $25,625 | Implemented |
MA0533 # 04 Y:2003 | 04 | 2003 | ADD AREA LIGHTING SWITCHES | $8,645 | $3,215 | Implemented |
MA0533 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,140 | $15,455 | Implemented |
MA0533 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,624 | $6,120 | Implemented |
MA0533 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,098 | $1,090 | Implemented |
UF0320 # 01 Y:2003 | 01 | 2003 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $25,707 | $48,985 | Implemented |
UF0320 # 03 Y:2003 | 03 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,161 | $225 | Implemented |
UF0320 # 08 Y:2003 | 08 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $7,009 | $4,000 | Implemented |
UF0320 # 09 Y:2003 | 09 | 2003 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $448,198 | $37,200 | Implemented |
SF0257 # 01 Y:2003 | 01 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,122 | $353 | Implemented |
SF0257 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,000 | $0 | Implemented |
SF0257 # 03 Y:2003 | 03 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $6,191 | $95 | Implemented |
SF0257 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $3,193 | $1,110 | Implemented |