IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 322211 Corrugated and Solid Fiber Box Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0129 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,745 $450 Not Implemented
BS0129 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,857 $712 Not Implemented
BS0129 # 07 Y:2019 07 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,558 $22,950 Not Implemented
BS0129 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,874 $4,056 Not Implemented
BS0129 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,337 $34,309 Not Implemented
BS0129 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,020 $1,102 Not Implemented
BS0129 # 02 Y:2019 02 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,961 $6,744 Not Implemented
BS0129 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,707 $13,390 Not Implemented
BS0129 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $6,885 $10,080 Not Implemented
BS0075 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $513 $502 Implemented
BS0075 # 05 Y:2016 05 2016 MINIMIZE WATER USAGE $256 $53 Implemented
BS0075 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $7,616 $3,250 Implemented
BS0075 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $146 $52 Implemented
BS0075 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,685 $1,464 Implemented
BS0075 # 06 Y:2016 06 2016 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $73,741 $24,334 Implemented
UU0099 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $8,020 $14,000 Not Implemented
UU0099 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,230 $2,510 Implemented
UU0099 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,100 $21,000 Not Implemented
UU0099 # 04 Y:2006 04 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,029 $7,500 Not Implemented
UU0099 # 03 Y:2006 03 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $36,960 $164,490 Not Implemented
UU0099 # 02 Y:2006 02 2006 ISOLATE HOT OR COLD EQUIPMENT $1,350 $0 Not Implemented
UU0099 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,650 $0 Implemented
UU0083 # 05 Y:2005 05 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $36,670 $87,400 Not Implemented
UU0083 # 04 Y:2005 04 2005 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $5,640 $0 Not Implemented
UU0083 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,880 $21,000 Not Implemented