IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 322211 Corrugated and Solid Fiber Box Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0804 # 10 Y:2009 10 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,963 $2,000 Not Implemented
UD0804 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $38,869 $12,000 Implemented
UD0804 # 03 Y:2009 03 2009 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $35,001 $9,000 Implemented
UD0804 # 04 Y:2009 04 2009 REPAIR OR REPLACE STEAM TRAPS $23,089 $4,000 Implemented
UD0804 # 05 Y:2009 05 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,277 $500 Implemented
UD0804 # 06 Y:2009 06 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $10,661 $6,000 Not Implemented
UD0804 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,414 $30,134 Not Implemented
UD0804 # 08 Y:2009 08 2009 KEEP BOILER TUBES CLEAN $8,490 $600 Implemented
UD0804 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,589 $5,523 Not Implemented
UD0804 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $49,362 $48,000 Not Implemented
UD0804 # 11 Y:2009 11 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,128 $0 Implemented
UD0804 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,004 $12,597 Not Implemented
UD0804 # 13 Y:2009 13 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,560 $0 Not Implemented
UD0804 # 14 Y:2009 14 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,920 $1,000 Not Implemented
UD0804 # 15 Y:2009 15 2009 ISOLATE HOT OR COLD EQUIPMENT $1,306 $0 Implemented
UD0804 # 16 Y:2009 16 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $2,094 Not Implemented
UD0804 # 17 Y:2009 17 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $270 $500 Not Implemented
UA0037 # 12 Y:2009 12 2009 INSTALL TIMERS AND/OR THERMOSTATS $16,135 $1,700 Implemented
UA0037 # 11 Y:2009 11 2009 USE RADIANT HEATER FOR SPOT HEATING $7,231 $16,448 Not Implemented
UA0037 # 10 Y:2009 10 2009 SHUT OFF PILOTS IN STANDBY EQUIPMENT $836 $0 Implemented
UA0037 # 09 Y:2009 09 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,938 $6,000 Implemented
UA0037 # 08 Y:2009 08 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,174 $32,445 Implemented
UA0037 # 07 Y:2009 07 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $17,492 $25,930 Not Implemented
UA0037 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,571 $2,500 Implemented
UA0037 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,336 $0 Implemented