IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 322212 Folding Paperboard Box Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0275 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,010 $4,120 Not Implemented
NC0275 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $455 $683 Implemented
NC0275 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,207 $4,563 Implemented
NC0275 # 03 Y:2003 03 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $12,088 $7,190 Not Implemented
NC0275 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,721 $63,800 Not Implemented
NC0275 # 01 Y:2003 01 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,058 $5,954 Not Implemented
LE0172 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,633 $131 Not Implemented
LE0172 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $309 $525 Not Implemented
LE0172 # 06 Y:2003 06 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,209 $210 Not Implemented
LE0172 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $16,220 Not Implemented
LE0172 # 04 Y:2003 04 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,812 $1,000 Not Implemented
LE0172 # 03 Y:2003 03 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,865 $630 Not Implemented
LE0172 # 01 Y:2003 01 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,875 $8,500 Not Implemented
TA0063 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $270 Implemented
TA0063 # 07 Y:2003 07 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $400 $0 Not Implemented
TA0063 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $560 $170 Not Implemented
TA0063 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,730 $17 Implemented
TA0063 # 04 Y:2003 04 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $18,000 $11,210 Implemented
TA0063 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,800 $660 Not Implemented
TA0063 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $22,400 $880 Not Implemented
TA0063 # 01 Y:2003 01 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $27,915 $0 Implemented
NC0266 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $744 $1,456 Implemented
NC0266 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $61 $132 Implemented
NC0266 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,833 $1,189 Implemented
NC0266 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $300 Implemented