IAC Assessment: TA0063
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0063
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Folding Paperboard Boxes
NAICS 322212 - Folding Paperboard Box Manufacturing
SIC 2657 - Folding Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 100,000
Annual Production 245,000,000 Pieces
Production Hrs. Annual 8,688
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $345,130 7,238,500 kWh $0.05
Electricity Demand $63,114 15,867 kW-months/year $3.98
Electricity Fees $28,768 - $ -
TOTAL ENERGY COSTS $617,012
RECOMMENDED SAVINGS* $99,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,785
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Electricity Usage Electricity Demand Electricity Fees Water Disposal
$ kWh $ kW-months/year $ $ $ Tgal
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$27,915
Cost:
-
- - - - $27,915 - - - -
-
kWh
-
-
kW-months/year
$27,915
-
$
-
-
Tgal
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$22,400
Cost:
$880
$20,000 417,000 $2,400 576 - - - - $20,000
417,000
kWh
$2,400
576
kW-months/year
-
-
$
-
-
Tgal
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$20,800
Cost:
$660
$18,570 385,750 $2,230 532 - - - - $18,570
385,750
kWh
$2,230
532
kW-months/year
-
-
$
-
-
Tgal
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$18,000
Cost:
$11,210
- - - - - - $18,000 200,000 -
-
kWh
-
-
kW-months/year
-
-
$
$18,000
200,000
Tgal
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,730
Cost:
$17
$9,730 202,100 - - - - - - $9,730
202,100
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$560
Cost:
$170
$560 11,700 - - - - - - $560
11,700
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$400
Cost:
-
$400 8,317 - - - - - - $400
8,317
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$140
Cost:
$270
$130 2,698 $10 3 - - - - $130
2,698
kWh
$10
3
kW-months/year
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$99,945
Cost:
$13,207
$49,390 1,027,565 $4,640 1,111 $27,915 - $18,000 200,000 $49,390
1,027,565
kWh
$4,640
1,111
kW-months/year
$27,915
-
$
$18,000
200,000
Tgal
TOTAL IMPLEMENTED Savings:
$55,785
Cost:
$11,497
$9,860 204,798 $10 3 $27,915 - $18,000 200,000 $9,860
204,798
kWh
$10
3
kW-months/year
$27,915
-
$
$18,000
200,000
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Water Disposal Electricity Usage Electricity Demand Electricity Fees Water Disposal