IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 322212 Folding Paperboard Box Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0169 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $339 $100 Not Implemented
UA0169 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $537 $415 Not Implemented
UA0169 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $753 $2,700 Implemented
UA0169 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,365 $100 Not Implemented
UA0169 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,505 $1,115 Not Implemented
UA0169 # 02 Y:2016 02 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,170 $1,200 Not Implemented
UA0169 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $5,115 $1,050 Not Implemented
UA0167 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $37,832 $3,743 Not Implemented
UA0167 # 02 Y:2016 02 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,023 $38,992 Not Implemented
UA0167 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,195 $35,575 Implemented
UA0167 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $2,865 $264 Not Implemented
UA0167 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,025 $4,765 Not Implemented
UA0167 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,424 $250 Not Implemented
UA0167 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,125 $4,435 Not Implemented
UA0167 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $575 $2,874 Not Implemented
UA0167 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $463 $150 Not Implemented
AM0710 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $400 $750 Not Implemented
AM0710 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $2,170 $2,100 Implemented
AM0710 # 05 Y:2016 05 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,635 $0 Implemented
AM0710 # 04 Y:2016 04 2016 PAY UTILITY BILLS ON TIME $2,944 $0 Implemented
AM0710 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,600 $1,160 Implemented
AM0710 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $27 Implemented
AM0710 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $9,400 $9,540 Not Implemented
AM0702 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,870 $1,320 Implemented
AM0702 # 10 Y:2016 10 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $141 $350 Implemented