IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 322219 Other Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0138 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,551 $54,600 Not Implemented
MI0138 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,014 $20,014 Not Implemented
MI0138 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,928 $1,074 Implemented
MI0138 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,522 $30 Not Implemented
MI0138 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $18,750 $4,708 Not Implemented
MI0138 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,001 $9,540 Not Implemented
MI0138 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,808 $713 Not Implemented
MI0138 # 08 Y:2006 08 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,463 $142 Not Implemented
CO0590 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,900 $1,320 Not Implemented
CO0590 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $500 Implemented
CO0590 # 11 Y:2006 11 2006 INSTALL OCCUPANCY SENSORS $210 $780 Not Implemented
CO0590 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $1,280 $680 Implemented
CO0590 # 09 Y:2006 09 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $3,850 $32,600 Not Implemented
CO0590 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,940 $70,090 Not Implemented
CO0590 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $560 $500 Implemented
CO0590 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $1,390 Not Implemented
CO0590 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,880 $0 Not Implemented
CO0590 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $560 $658 Implemented
CO0590 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,660 $100 Implemented
CO0590 # 01 Y:2006 01 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,450 $770 Not Implemented
LE0229 # 01 Y:2006 01 2006 REDESIGN PROCESS $80,430 $30,000 Not Implemented
LE0229 # 02 Y:2006 02 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $64,670 $27,200 Implemented
LE0229 # 06 Y:2006 06 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,898 $316 Not Implemented
LE0229 # 07 Y:2006 07 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,542 $2,100 Not Implemented
LE0229 # 08 Y:2006 08 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,528 $2,500 Not Implemented