IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 32222 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0459 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,564 $2,200 Implemented
SD0459 # 05 Y:2012 05 2012 USE MINIMUM STEAM OPERATING PRESSURE $276 $200 Implemented
SF0403 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,944 $9,877 Implemented
SF0403 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $1,801 $5,900 Implemented
SF0403 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $681 $1,471 Implemented
SF0403 # 02 Y:2011 02 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,307 $2,006 Implemented
SF0403 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,239 $720 Implemented
SF0396 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $339 $310 Implemented
SF0396 # 10 Y:2011 10 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,040 $23,228 Implemented
SF0396 # 09 Y:2011 09 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $583 $2,107 Implemented
SF0396 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,045 $22,410 Implemented
SF0396 # 06 Y:2011 06 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $605 $1,540 Implemented
SF0396 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $5,645 $7,073 Implemented
SF0396 # 02 Y:2011 02 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,498 $1,199 Implemented
SF0396 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,923 $0 Implemented
SF0326 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,157 $38,849 Implemented
SF0326 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,076 $12,276 Implemented
SF0326 # 01 Y:2006 01 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $29,674 $0 Implemented
SF0320 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,797 $2,531 Implemented
SF0320 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $528 $488 Implemented
SD0331 # 04 Y:2004 04 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,220 $5,000 Implemented
SD0331 # 05 Y:2004 05 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $108,200 $110,000 Implemented