IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

439

matching recommendations
Reset
NAICS 32222 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0251 # 04 Y:2007 04 2007 INSTALL SET-BACK TIMERS $8,210 $457 Not Implemented
SU0251 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,670 $480 Implemented
SU0251 # 06 Y:2007 06 2007 REPAIR OR REPLACE STEAM TRAPS $2,314 $219 Implemented
SU0251 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,420 $8,140 Implemented
SU0251 # 08 Y:2007 08 2007 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $38,999 $17,176 Not Implemented
SU0251 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,026 $5,000 Implemented
SU0251 # 10 Y:2007 10 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $278 $130 Not Implemented
SU0251 # 11 Y:2007 11 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234 $150 Not Implemented
SU0251 # 12 Y:2007 12 2007 INSTALL OCCUPANCY SENSORS $1,778 $1,620 Not Implemented
SU0251 # 13 Y:2007 13 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,970 $2,556 Implemented
SU0251 # 14 Y:2007 14 2007 OPTIMIZE PLANT POWER FACTOR $3,906 $14,129 Not Implemented
OR0514 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,300 $0 Implemented
OR0514 # 02 Y:2007 02 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $135,120 $4,350 Not Implemented
OR0514 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,900 $500 Not Implemented
OR0514 # 04 Y:2007 04 2007 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,400 $1,000 Not Implemented
OR0514 # 05 Y:2007 05 2007 DEVELOP STANDARD OPERATING PROCEDURES $204,000 $18,800 Not Implemented
OR0514 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $7,700 Implemented
OR0514 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $16,800 $11,500 Not Implemented
OR0514 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,700 $0 Implemented
OR0514 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,900 $7,400 Not Implemented
SF0326 # 01 Y:2006 01 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $29,674 $0 Implemented
SF0326 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,158 $0 Not Implemented
SF0326 # 03 Y:2006 03 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $18,476 $5,600 Not Implemented
SF0326 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,076 $12,276 Implemented
SF0326 # 05 Y:2006 05 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $28,919 $17,664 Not Implemented