IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

454

matching recommendations
Reset
NAICS 32222 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0701 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $43,354 $1,623 Implemented
OK0701 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,396 $8,850 Implemented
OK0701 # 05 Y:2005 05 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,082 $13,500 Not Implemented
OK0701 # 06 Y:2005 06 2005 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,169 $275 Not Implemented
BD0280 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $34,711 $34,000 Not Implemented
BD0280 # 02 Y:2005 02 2005 USE RADIANT HEATER FOR SPOT HEATING $30,129 $31,500 Not Implemented
BD0280 # 03 Y:2005 03 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $13,187 $1,000 Not Implemented
BD0280 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $10,565 $5,850 Implemented
BD0280 # 05 Y:2005 05 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $10,110 $1,000 Implemented
BD0280 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,694 $9,500 Not Implemented
BD0280 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,514 $1,400 Implemented
BD0280 # 08 Y:2005 08 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,413 $2,000 Implemented
BD0280 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,944 $0 Implemented
BD0280 # 10 Y:2005 10 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $708 $750 Not Implemented
TA0077 # 01 Y:2004 01 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $42,000 $0 Not Implemented
TA0077 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,970 $0 Not Implemented
TA0077 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,104 $8,650 Not Implemented
TA0077 # 04 Y:2004 04 2004 RECOVER AND REUSE COOLING WATER $4,087 $1,685 Not Implemented
TA0077 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,474 $840 Not Implemented
CO0549 # 01 Y:2004 01 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $29,210 $116,000 Not Implemented
CO0549 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,000 $27,900 Not Implemented
CO0549 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,130 $3,800 Not Implemented
CO0549 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,920 $510 Implemented
CO0549 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,780 $60 Not Implemented
CO0549 # 06 Y:2004 06 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $650 $500 Implemented