IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

444

matching recommendations
Reset
NAICS 32222 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0280 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,514 $1,400 Implemented
BD0280 # 08 Y:2005 08 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,413 $2,000 Implemented
BD0280 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,944 $0 Implemented
BD0280 # 10 Y:2005 10 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $708 $750 Not Implemented
TA0077 # 01 Y:2004 01 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $42,000 $0 Not Implemented
TA0077 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,970 $0 Not Implemented
TA0077 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,104 $8,650 Not Implemented
TA0077 # 04 Y:2004 04 2004 RECOVER AND REUSE COOLING WATER $4,087 $1,685 Not Implemented
TA0077 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,474 $840 Not Implemented
CO0549 # 01 Y:2004 01 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $29,210 $116,000 Not Implemented
CO0549 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,000 $27,900 Not Implemented
CO0549 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,130 $3,800 Not Implemented
CO0549 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,920 $510 Implemented
CO0549 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,780 $60 Not Implemented
CO0549 # 06 Y:2004 06 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $650 $500 Implemented
CO0549 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $360 Not Implemented
CO0549 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,840 $58,140 Implemented
NC0289 # 01 Y:2004 01 2004 RECYCLE WASTE INK AND CLEANUP SOLVENT $21,873 $25,000 Implemented
NC0289 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,527 $0 Not Implemented
NC0289 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $230 $154 Not Implemented
NC0289 # 04 Y:2004 04 2004 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $972 $1,000 Not Implemented
WV0294 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,792 $30,627 Not Implemented
WV0294 # 02 Y:2004 02 2004 INSTALL OCCUPANCY SENSORS $10,219 $4,900 Not Implemented
WV0294 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $5,704 $230 Implemented
WV0294 # 04 Y:2004 04 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,247 $2,660 Implemented