IAC logo
IAC Assessment: WI0494
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0494
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2005
Principal Product Printing labels
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672 - Paper Coated And Laminated, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 65,600
Annual Production 36,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,304 3,475,393 kWh $0.03
Electricity Demand $86,384 9,066 kW-months/year $9.53
Natural Gas $19,519 2,364 MMBtu $8.26
TOTAL ENERGY COSTS $214,663
RECOMMENDED SAVINGS* $26,351 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,231
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,360
Cost:
$11,500
$658 22,380 $2,702 269 - - - - $658
22,380
kWh
$2,702
269
kW-months/year
-
-
MMBtu
-
-
gal
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$12,456
Cost:
$16,500
- - - - - - $12,456 11,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,456
11,000
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,231
Cost:
$12,960
$3,101 105,840 $2,130 212 - - - - $3,101
105,840
kWh
$2,130
212
kW-months/year
-
-
MMBtu
-
-
gal
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,060
Cost:
$6,060
$2,544 86,820 $1,516 151 - - - - $2,544
86,820
kWh
$1,516
151
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,037
Cost:
$1,000
- - - - $1,037 126 - - -
-
kWh
-
-
kW-months/year
$1,037
126
MMBtu
-
-
gal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$207
Cost:
$640
$117 4,004 $90 9 - - - - $117
4,004
kWh
$90
9
kW-months/year
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$26,351
Cost:
$48,660
$6,420 219,044 $6,438 641 $1,037 126 $12,456 11,000 $6,420
219,044
kWh
$6,438
641
kW-months/year
$1,037
126
MMBtu
$12,456
11,000
gal
TOTAL IMPLEMENTED Savings:
$5,231
Cost:
$12,960
$3,101 105,840 $2,130 212 - - - - $3,101
105,840
kWh
$2,130
212
kW-months/year
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)