Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
444
matching recommendationsNAICS | 32222 | Paper Bag and Coated and Treated Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0503 # 02 Y:2021 | 02 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $30 | $0 | Not Implemented |
SU0503 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,396 | $0 | Implemented |
SU0503 # 04 Y:2021 | 04 | 2021 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $945 | $340 | Not Implemented |
UF0557 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,904 | $455 | Implemented |
UF0557 # 06 Y:2020 | 06 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $8,554 | $38,357 | Not Implemented |
UF0557 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $33,993 | $25,529 | Implemented |
UF0557 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $33,607 | $165,000 | Implemented |
UF0557 # 08 Y:2020 | 08 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,710 | $5,998 | Implemented |
UF0557 # 01 Y:2020 | 01 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $34,350 | $150,000 | Implemented |
UF0557 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,870 | $8,850 | Implemented |
UF0557 # 07 Y:2020 | 07 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,282 | $25,340 | Implemented |
UF0557 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,548 | $2,336 | Implemented |
UD1025 # 10 Y:2020 | 10 | 2020 | INSTALL EQUIPMENT TO MOVE PRODUCT | $454,408 | $375,000 | Not Implemented |
UD1025 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,963 | $26,366 | Not Implemented |
UD1025 # 01 Y:2020 | 01 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,747 | $0 | Not Implemented |
UD1025 # 09 Y:2020 | 09 | 2020 | INSTALL OCCUPANCY SENSORS | $11,875 | $4,845 | Not Implemented |
UD1025 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $3,612 | $7,325 | Not Implemented |
UD1025 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,411 | $4,000 | Not Implemented |
UD1025 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $83,809 | $25,133 | Not Implemented |
UD1025 # 06 Y:2020 | 06 | 2020 | COMBINE UTILITY METERS | $8,278 | $0 | Not Implemented |
UD1025 # 05 Y:2020 | 05 | 2020 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,710 | $5,224 | Not Implemented |
UD1025 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,051 | $340 | Implemented |
AS0480 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $605 | $2,300 | Not Implemented |
AS0480 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,044 | $9,363 | Implemented |
AS0480 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,276 | $9,045 | Not Implemented |