IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 32222 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0801 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,210 $2,397 Not Implemented
MA0801 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,249 $1,250 Not Implemented
MA0801 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,364 $4,110 Not Implemented
MA0801 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $6,653 $8,930 Not Implemented
MA0801 # 02 Y:2019 02 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,204 $200 Not Implemented
MA0801 # 01 Y:2019 01 2019 RECOVER WASTE HEAT FROM EQUIPMENT $416,385 $525,000 Not Implemented
MA0692 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,509 $200 Not Implemented
MA0692 # 08 Y:2012 08 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,013 $3,000 Not Implemented
MA0692 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,135 $3,260 Not Implemented
MA0692 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,145 $3,183 Not Implemented
MA0692 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,162 $7,150 Not Implemented
MA0692 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $3,685 $2,500 Not Implemented
MA0692 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,554 $33,000 Not Implemented
MA0692 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,573 $24,000 Not Implemented
MA0602 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $79,413 $172,300 Not Implemented
MA0602 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $1,122 $950 Implemented
MA0602 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $1,918 $700 Not Implemented
MA0602 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,526 $8,755 Not Implemented
MA0602 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $8,388 $4,050 Implemented
MA0602 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,691 $749 Implemented
MA0602 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,335 $96,992 Implemented
MA0602 # 02 Y:2006 02 2006 USE MINIMUM SAFE OVEN VENTILATION $71,115 $115,075 Not Implemented