IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 32222 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0157 # 12 Y:2009 12 2009 DISCONNECT BALLASTS $4,133 $1,070 Implemented
IC0157 # 11 Y:2009 11 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $162,607 $289,000 Implemented
IC0157 # 10 Y:2009 10 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,332 $0 Not Implemented
IC0157 # 09 Y:2009 09 2009 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,416 $210 Not Implemented
IC0157 # 08 Y:2009 08 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,436 $1,524 Implemented
IC0157 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,603 $805 Implemented
IC0157 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $968 $1,964 Implemented
IC0157 # 05 Y:2009 05 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,159 $1,572 Not Implemented
IC0157 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $363 Implemented
IC0157 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,162 $4,848 Implemented
IC0157 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,780 $9,923 Implemented
IC0157 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $769 $470 Not Implemented
NC0390 # 04 Y:2009 04 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,533 $50 Implemented
NC0390 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,223 $50,369 Not Implemented
NC0390 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,075 $0 Not Implemented
NC0390 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $432 Not Implemented
NC0390 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $46,662 $67,500 Not Implemented
NC0390 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $871 $100 Implemented
LE0286 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,998 $192 Implemented
LE0286 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,833 $350 Implemented
LE0286 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,921 $25,494 Implemented
LE0286 # 01 Y:2009 01 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $20,166 $9,360 Not Implemented
LE0286 # 02 Y:2009 02 2009 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $15,000 $40,000 Not Implemented
LE0286 # 03 Y:2009 03 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,875 $10,000 Not Implemented
LE0286 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,170 $1,152 Not Implemented