Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2009 |
Principal Product | packing list envelops |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 30,000,000 Units |
Production Hrs. Annual | 4,160 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $361,899 | 3,127,258 | kWh | $0.12 |
Electricity Demand | $78,219 | 9,055 | kW-months/year | $8.64 |
Natural Gas | $230,832 | 16,727 | MMBtu | $13.80 |
TOTAL ENERGY COSTS | $670,950 | |||
RECOMMENDED SAVINGS* | $79,159 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,926 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Gas | Increase in Production | Electricity Usage | Electricity Demand | Other Gas | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $20,166 Cost: $9,360 |
- | - | $20,166 | 978 | - | - | - | - |
- - kWh |
$20,166 978 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS |
Savings: $15,000 Cost: $40,000 |
- | - | - | - | - | - | $15,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$15,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $12,875 Cost: $10,000 |
$3,524 | 312,000 | - | - | $9,351 | 3,250 | - | - |
$3,524 312,000 kWh |
- - kW-months/year |
$9,351 3,250 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,170 Cost: $1,152 |
$4,928 | 43,784 | $1,242 | 126 | - | - | - | - |
$4,928 43,784 kWh |
$1,242 126 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,022 Cost: $800 |
$1,568 | 14,049 | $454 | 46 | - | - | - | - |
$1,568 14,049 kWh |
$454 46 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,998 Cost: $192 |
$1,594 | 14,178 | $404 | 41 | - | - | - | - |
$1,594 14,178 kWh |
$404 41 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,833 Cost: $350 |
$1,478 | 13,007 | $355 | 36 | - | - | - | - |
$1,478 13,007 kWh |
$355 36 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $1,174 Cost: $100 |
$937 | 8,320 | $237 | 24 | - | - | - | - |
$937 8,320 kWh |
$237 24 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,921 Cost: $25,494 |
$14,628 | 115,719 | $3,293 | 334 | - | - | - | - |
$14,628 115,719 kWh |
$3,293 334 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $79,159 Cost: $87,448 |
$28,657 | 521,057 | $26,151 | 1,585 | $9,351 | 3,250 | $15,000 | - | $28,657 521,057 kWh |
$26,151 1,585 kW-months/year |
$9,351 3,250 MMBtu |
$15,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,926 Cost: $26,136 |
$18,637 | 151,224 | $4,289 | 435 | - | - | - | - | $18,637 151,224 kWh |
$4,289 435 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Gas | Increase in Production | Electricity Usage | Electricity Demand | Other Gas | Increase in Production |