IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
NAICS 32222 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0395 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $8,974 $8,890 Not Implemented
UM0395 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,323 $5,000 Not Implemented
UM0395 # 05 Y:2011 05 2011 HEAT WATER WITH EXHAUST HEAT $798 $2,261 Not Implemented
UM0395 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $51,920 $110,521 Not Implemented
UM0395 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,425 $15,571 Not Implemented
UM0395 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $222 $161 Not Implemented
SF0403 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,142 $15,378 Not Implemented
SF0403 # 04 Y:2011 04 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,148 $20,097 Not Implemented
SF0403 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,026 $14,750 Not Implemented
SF0403 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,239 $720 Implemented
SF0403 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $681 $1,471 Implemented
SF0403 # 02 Y:2011 02 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,307 $2,006 Implemented
SF0403 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $1,801 $5,900 Implemented
SF0403 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,944 $9,877 Implemented
SF0403 # 09 Y:2011 09 2011 USE PHOTOCELL CONTROLS $912 $5,037 Not Implemented
GT0886 # 05 Y:2011 05 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $24,782 $14,000 Implemented
GT0886 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $51,129 $25,000 Implemented
GT0886 # 03 Y:2011 03 2011 DEVELOP A REPAIR/REPLACE POLICY $3,617 $9,994 Implemented
GT0886 # 02 Y:2011 02 2011 METER WASTE WATER $5,529 $2,500 Implemented
GT0886 # 01 Y:2011 01 2011 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,160 $2,400 Not Implemented
UM0389 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,327 $325 Not Implemented
UM0389 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $2,426 $1,142 Implemented
UM0389 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,425 $4,815 Implemented
UM0389 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,641 $1,300 Not Implemented
UM0389 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $891 $5,000 Implemented