Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
NAICS 322220 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0680 # 03 Y:2013 03 2013 REPAIR AND ELIMINATE STEAM LEAKS $490 $230 Implemented
CO0680 # 02 Y:2013 02 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,370 $31,720 Not Implemented
CO0680 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,930 $1,310 Implemented
CO0640 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,720 $1,140 Implemented
CO0640 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $3,060 Implemented
CO0640 # 05 Y:2010 05 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $1,920 $35,000 Not Implemented
CO0640 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,710 $18,500 Implemented
CO0640 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,900 $2,650 Not Implemented
CO0640 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,870 $3,410 Not Implemented
CO0549 # 01 Y:2004 01 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $29,210 $116,000 Not Implemented
CO0549 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,840 $58,140 Implemented
CO0549 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $360 Not Implemented
CO0549 # 06 Y:2004 06 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $650 $500 Implemented
CO0549 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,780 $60 Not Implemented
CO0549 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,920 $510 Implemented
CO0549 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,130 $3,800 Not Implemented
CO0549 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,000 $27,900 Not Implemented