Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
NAICS 32223 Stationery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0412 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,039 $17,808 n/a
MS0412 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $10,030 $96,425 n/a
MS0412 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $108 $0 n/a
MS0412 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $3,382 $1,476 n/a
LE0469 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,425 $18,125 Not Implemented
LE0469 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,507 $1,000 Not Implemented
LE0469 # 04 Y:2019 04 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,723 $23,000 Not Implemented
LE0469 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $5,321 $6,000 Not Implemented
LE0469 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $159 $175 Not Implemented
AS0455 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,307 $180 Implemented
AS0455 # 07 Y:2018 07 2018 PAY BILLS ON TIME TO AVOID LATE FEES $15,576 $0 Not Implemented
AS0455 # 06 Y:2018 06 2018 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,556 $0 Not Implemented
AS0455 # 05 Y:2018 05 2018 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $114,480 $30,000 Implemented
AS0455 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,551 $12,598 Implemented
AS0455 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,097 $36,012 Implemented
AS0455 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,768 $800 Not Implemented
LE0427 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,286 $1,200 Implemented
LE0427 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,735 $1,000 Implemented
LE0427 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,186 $5,500 Not Implemented
LE0427 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,580 $3,500 Implemented
LE0427 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $14,438 Implemented
LE0427 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,621 $5,775 Implemented
NC0541 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,334 $1,131 Not Implemented
NC0541 # 01 Y:2015 01 2015 DEVELOP STANDARD OPERATING PROCEDURES $27,300 $10,000 Not Implemented
NC0541 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $596 $160 Implemented