IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

222

matching recommendations
Reset
NAICS 32229 Other Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0003 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $360 Implemented
WM0003 # 06 Y:2012 06 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $493 $99 Not Implemented
WM0003 # 07 Y:2012 07 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,160 $900 Not Implemented
DL0070 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $136,635 $120,000 Implemented
DL0070 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $12,200 $200 Implemented
DL0070 # 03 Y:2011 03 2011 REDUCE VENTILATION AIR $2,160 $45 Not Implemented
DL0070 # 04 Y:2011 04 2011 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $14,330 $500 Implemented
DL0070 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,782 $1,800 Not Implemented
DL0070 # 06 Y:2011 06 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $104,177 $157,000 Implemented
DL0070 # 07 Y:2011 07 2011 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $4,600 $10,000 Not Implemented
DL0070 # 08 Y:2011 08 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $21,528 $52,000 Implemented
DL0070 # 09 Y:2011 09 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,701 $10,500 Not Implemented
DL0070 # 10 Y:2011 10 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $33,730 $1,035,000 Not Implemented
LE0316 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,608 $67,275 Not Implemented
LE0316 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,225 $11,500 Not Implemented
LE0316 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,035 $13,000 Not Implemented
LE0316 # 04 Y:2011 04 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,994 $3,000 Not Implemented
LE0316 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,230 $25,000 Not Implemented
LE0316 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $2,639 $2,250 Not Implemented
LE0316 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,209 $3,200 Not Implemented
LE0316 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,621 $1,120 Not Implemented
LE0316 # 09 Y:2011 09 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,438 $23,800 Not Implemented
LE0316 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,860 $3,600 Not Implemented
LE0316 # 11 Y:2011 11 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $3,205 Not Implemented
LE0316 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,182 $1,000 Not Implemented